Risk-Control Matrix Template#
A risk-control matrix records, in one place, the chain described in Control Design and Effectiveness: the risk, the objective that manages it, the control, the evidence it produces, what counts as an exception and what happens next. This page gives the template and ten examples from valuation control. The examples are illustrative, and the wording, thresholds and timelines should be replaced with those of the firm.
How to use the matrix#
List the risks first. Start from where valuations can go wrong, using the sources in Valuation Risk, and not from the controls that already exist. A control without a risk is a candidate for removal, and a risk without a control is a gap.
Write a testable objective. It should be clear what a pass and a fail look like.
Describe the control precisely. Say who does what, how often, on which population, and whether it is manual or automated, preventive or detective.
Name the evidence. Say what is produced and where it is kept, so that someone else can reperform the control.
Define the exception. State the threshold or the condition, so that a finding is not a matter of opinion.
Give the escalation. State who is told, by when, and what remediation is expected.
Add owners and frequencies. In a working copy, add columns for the control owner, the frequency, the system and the last test date. They are left out below to keep the table readable.
Review it. Review the matrix when products, sources, models and systems change, and after any control failure.
The matrix serves the valuation-control view. If the firm also has to map controls to SOX Section 404 or ICFR, the same rows can be linked to the financial-reporting control inventory. See Financial Reporting Controls and SOX. The Valuation Control Checklist can be used to find the areas where rows are missing.
Template with examples#
Risk |
Control objective |
Control |
Evidence |
Exception |
Escalation / remediation |
|---|---|---|---|---|---|
A stale market data input is used for the official mark. |
All inputs used in the mark are current at the valuation time. |
Automated daily staleness check on each input against a defined age limit, with a report to valuation control. |
Staleness report, with input, age and limit, retained daily. |
Any input older than its limit, or a missing input. |
Valuation control investigates the same day. A fallback source or proxy is approved if the input cannot be refreshed. |
The desk mark is biased in its own favour, for a quoted product. |
Marks for quoted products are supported by independent prices within tolerance. |
Monthly (or more often) price-based IPV against an independent pricing service, with breaches investigated. |
IPV comparison file, breach list, investigation notes and reviewer sign-off. |
Difference above tolerance, or a position not compared. |
Breaches above the materiality threshold go to the head of valuation control within two working days. Adjustment is booked if unresolved at month end. |
A long-dated volatility input is not supported by market evidence. |
Volatility inputs are within tolerance of independent evidence, or the difference is adjusted. |
Input-based IPV against consensus data, with the dispersion and the number of contributors recorded. |
Consensus extract, the comparison, the value effect and the sign-off. |
Difference above tolerance, fewer than three contributors, or a high dispersion. |
Escalate to the valuation forum. Consider a reserve, Level 3 classification and the AVA input. |
An independent source is not independent, for example it reflects the desk’s own contribution. |
Sources used for IPV are independent of the desk, relevant and representative. |
Annual source review, and the approval of new sources, with the independence assessment recorded. |
Source register, with the independence assessment and the approval. |
A source without an assessment, or a source found to depend on the firm’s own contribution. |
Remove the source from use, re-perform IPV for the affected period with an alternative, and report to the forum. |
A model is used outside its approved scope. |
Trades are valued only with a model that is approved for the product and the conditions. |
Scope check at trade booking and monthly review of the model inventory against the trade population. |
Scope report, model inventory extract, exceptions log. |
A trade with a model that is not approved for it, or an unapproved model. |
Restrict new trading, assess the value effect with an alternative model, and apply a model reserve if needed. |
Model uncertainty is not reflected in the value. |
Model reserves cover the uncertainty from model choice and calibration where market participants would price it. |
Quarterly model reserve review, using alternative models or calibrations for the highest-risk products. |
Reserve calculation, alternative values, approval minutes. |
A material difference between models without a reserve, or a reserve not reviewed in the period. |
Present to the reserve review with a proposal, and book the reserve or record the reason it is not needed. |
A methodology change is made without approval, or without an impact assessment. |
Material changes to a methodology are approved and their effect is measured. |
Change-control process, with an impact assessment on the live portfolio and committee approval. |
Change request, impact assessment, approval minutes, release record. |
A change to the production valuation without an approval, or an impact not assessed. |
Reverse the change or ratify with an assessment. Report as a control breach to the governance committee. |
A manual override replaces the methodology output without support. |
Overrides are supported by evidence, authorised and time-limited. |
Override register, with a written reason, evidence, approval by level, and an expiry date. |
Register entries, the supporting evidence, approvals. |
An override with no evidence, no approval or past its expiry, or a repeated pattern. |
Reject or limit the override to what the evidence supports. Report patterns to the governance committee. |
A position is assigned a wrong level in the fair-value hierarchy. |
Each position is at the level supported by the observability of its significant inputs. |
Quarterly levelling review, applying the policy to the input-level evidence from IPV, and review of the transfers. |
Levelling report, input-level evidence, transfer analysis, sign-off. |
A position without a level, a level not supported by evidence, or an unexplained transfer. |
Correct the level and the disclosure, assess the effect on the reconciliation, and inform Finance before the reporting deadline. |
Valuation adjustments in the valuation system do not agree with the ledger. |
Adjustments and reserves in the accounts equal those calculated by valuation control. |
Monthly reconciliation of the reserve report to the general ledger, by adjustment type. |
Reconciliation, with differences explained and the review sign-off. |
An unreconciled difference above a threshold, or a reconciliation that is late. |
Investigate and book the correction in the period. Escalate to the financial controller if it cannot be resolved by the close. |