From Front-Office PV to the Balance Sheet#

Valuation control’s job in the accounts is to take the number that the front office produces and show how it becomes the carrying value, the P&L and the balance sheet. This page follows one position through that chain. The financial statements page does the same for a whole book, and the standards are in IFRS 13: Fair Value Measurement and IFRS 9: Financial Instruments.

The chain#

Front-office PV (mid, clean)
      |  valuation adjustments and reserves
      v
Fair value (exit price)
      |  classification and measurement basis
      v
Carrying value
      |  P&L or OCI
      v
Balance sheet, P&L and OCI, and the notes

Each arrow is a decision that valuation control checks, and each has a part of the standards behind it.

One trade, end to end#

The trade is a 5-year pay-fixed swap with a corporate client, with no collateral. It is a derivative, so it is measured at fair value through profit or loss. The amounts are in millions of currency units.

Step 1: the front-office PV. The desk values the swap from the curve at mid prices. The PV is a clean value, which ignores the counterparty credit, the funding and the cost of closing out.

Step 2: the adjustments. Valuation control takes that mark to an exit price, as IFRS 13: Fair Value Measurement requires, with the adjustments for the credit and funding costs from the XVA series and for the cost of closing the position:

From the PV to fair value, at the reporting date#

Item

Previous month end

This month end

Front-office PV (mid)

0.50

2.20

CVA, the counterparty’s credit risk

(0.08)

(0.18)

DVA, the bank’s own credit risk

0.02

0.03

FVA, the cost of funding

(0.02)

(0.06)

Bid-offer and close-out reserve

(0.02)

(0.05)

Fair value

0.40

1.94

Step 3: the carrying value. A derivative is carried at fair value, so the carrying value is 1.94. A position in a different category would be carried on a different basis, as the next section shows.

Step 4: the P&L. The movement in the fair value in the month is 1.94 less 0.40, which is 1.54. It is made up of the desk’s P&L and the change in the adjustments:

The monthly movement#

Item

Amount

Change in the front-office PV (the desk P&L)

1.70

Change in CVA

(0.10)

Change in DVA

0.01

Change in FVA

(0.04)

Change in the bid-offer and close-out reserve

(0.03)

Movement in the fair value, to the P&L

1.54

The entry is:

The monthly entry#

Event

Account

Debit

Credit

Fair value rises from 0.40 to 1.94

Derivative asset

1.54

Trading income (P&L)

1.54

The desk reports 1.70. The accounts report 1.54. Valuation control explains the 0.16 difference line by line, as every reserve movement is a charge or a credit to the P&L.

Step 5: the balance sheet and the notes. The derivative asset of 1.94 is shown on the balance sheet. Two points apply:

  • Offsetting: derivative assets and liabilities with the same counterparty are shown net on the balance sheet only if the firm has a legally enforceable right of set-off and intends to settle net or at the same time. Otherwise they are shown gross.

  • The level: the swap is valued from observable curves, which is Level 2. But the CVA uses a credit spread for the corporate that may not be observable. If that input is significant to the whole measurement, the fair value is Level 3. See Fair-Value Hierarchy: Levels 1, 2 & 3.

Day-one profit or loss#

If the swap had been traded at a price that gave the bank a profit on the day, the model value could be above the transaction price. That day-one difference can only be recognised if the fair value is evidenced by a Level 1 price or by a technique that uses only observable data. Otherwise it is deferred and released over time. A New Trade, Day One to the Balance Sheet follows two new trades, one recognised and one deferred, from the booking to the balance sheet.

The same position under other bases#

The route from PV to the accounts depends on the classification:

The same economic position under different bases#

Position

Carrying value

Movement goes to

Valuation control role

Derivative, FVTPL

Fair value after the adjustments

P&L

IPV, reserves and levelling

Derivative in a cash flow hedge

Fair value

OCI for the effective part, P&L for the rest

The same, plus the reserve reconciliation. See Hedge Accounting

Bond, FVOCI

Fair value

OCI, and impairment to the P&L

IPV and levelling

Loan or bond, amortised cost

Amortised cost less the loss allowance

Interest and impairment in the P&L

Fair value for the notes only. See Amortised Cost

A valuation control view#

  • The bridge is the control: from the front-office PV to the fair value, every adjustment has an owner, a methodology and a movement that is explained. An unexplained difference between the desk and the accounts is a control failure.

  • Reserves move the P&L: a change in a reserve, even when the PV has not moved, is a P&L entry. Check that the movement in each reserve is attributed.

  • Check the classification before the valuation: a position that is classified differently from its documentation is measured on the wrong basis, and the valuation work is on the wrong population.

  • Check the level of the whole measurement: a Level 2 curve with a Level 3 credit input can make the swap a Level 3 position.

  • Trace the number to the statements: the sum of the carrying values by category should agree with the balance sheet and the fair value notes. See Financial Statements.