From Front-Office PV to the Balance Sheet#
Valuation control’s job in the accounts is to take the number that the front office produces and show how it becomes the carrying value, the P&L and the balance sheet. This page follows one position through that chain. The financial statements page does the same for a whole book, and the standards are in IFRS 13: Fair Value Measurement and IFRS 9: Financial Instruments.
The chain#
Front-office PV (mid, clean)
| valuation adjustments and reserves
v
Fair value (exit price)
| classification and measurement basis
v
Carrying value
| P&L or OCI
v
Balance sheet, P&L and OCI, and the notes
Each arrow is a decision that valuation control checks, and each has a part of the standards behind it.
One trade, end to end#
The trade is a 5-year pay-fixed swap with a corporate client, with no collateral. It is a derivative, so it is measured at fair value through profit or loss. The amounts are in millions of currency units.
Step 1: the front-office PV. The desk values the swap from the curve at mid prices. The PV is a clean value, which ignores the counterparty credit, the funding and the cost of closing out.
Step 2: the adjustments. Valuation control takes that mark to an exit price, as IFRS 13: Fair Value Measurement requires, with the adjustments for the credit and funding costs from the XVA series and for the cost of closing the position:
Item |
Previous month end |
This month end |
|---|---|---|
Front-office PV (mid) |
0.50 |
2.20 |
CVA, the counterparty’s credit risk |
(0.08) |
(0.18) |
DVA, the bank’s own credit risk |
0.02 |
0.03 |
FVA, the cost of funding |
(0.02) |
(0.06) |
Bid-offer and close-out reserve |
(0.02) |
(0.05) |
Fair value |
0.40 |
1.94 |
Step 3: the carrying value. A derivative is carried at fair value, so the carrying value is 1.94. A position in a different category would be carried on a different basis, as the next section shows.
Step 4: the P&L. The movement in the fair value in the month is 1.94 less 0.40, which is 1.54. It is made up of the desk’s P&L and the change in the adjustments:
Item |
Amount |
|---|---|
Change in the front-office PV (the desk P&L) |
1.70 |
Change in CVA |
(0.10) |
Change in DVA |
0.01 |
Change in FVA |
(0.04) |
Change in the bid-offer and close-out reserve |
(0.03) |
Movement in the fair value, to the P&L |
1.54 |
The entry is:
Event |
Account |
Debit |
Credit |
|---|---|---|---|
Fair value rises from 0.40 to 1.94 |
Derivative asset |
1.54 |
|
Trading income (P&L) |
1.54 |
The desk reports 1.70. The accounts report 1.54. Valuation control explains the 0.16 difference line by line, as every reserve movement is a charge or a credit to the P&L.
Step 5: the balance sheet and the notes. The derivative asset of 1.94 is shown on the balance sheet. Two points apply:
Offsetting: derivative assets and liabilities with the same counterparty are shown net on the balance sheet only if the firm has a legally enforceable right of set-off and intends to settle net or at the same time. Otherwise they are shown gross.
The level: the swap is valued from observable curves, which is Level 2. But the CVA uses a credit spread for the corporate that may not be observable. If that input is significant to the whole measurement, the fair value is Level 3. See Fair-Value Hierarchy: Levels 1, 2 & 3.
Day-one profit or loss#
If the swap had been traded at a price that gave the bank a profit on the day, the model value could be above the transaction price. That day-one difference can only be recognised if the fair value is evidenced by a Level 1 price or by a technique that uses only observable data. Otherwise it is deferred and released over time. A New Trade, Day One to the Balance Sheet follows two new trades, one recognised and one deferred, from the booking to the balance sheet.
The same position under other bases#
The route from PV to the accounts depends on the classification:
Position |
Carrying value |
Movement goes to |
Valuation control role |
|---|---|---|---|
Derivative, FVTPL |
Fair value after the adjustments |
P&L |
IPV, reserves and levelling |
Derivative in a cash flow hedge |
Fair value |
OCI for the effective part, P&L for the rest |
The same, plus the reserve reconciliation. See Hedge Accounting |
Bond, FVOCI |
Fair value |
OCI, and impairment to the P&L |
IPV and levelling |
Loan or bond, amortised cost |
Amortised cost less the loss allowance |
Interest and impairment in the P&L |
Fair value for the notes only. See Amortised Cost |
A valuation control view#
The bridge is the control: from the front-office PV to the fair value, every adjustment has an owner, a methodology and a movement that is explained. An unexplained difference between the desk and the accounts is a control failure.
Reserves move the P&L: a change in a reserve, even when the PV has not moved, is a P&L entry. Check that the movement in each reserve is attributed.
Check the classification before the valuation: a position that is classified differently from its documentation is measured on the wrong basis, and the valuation work is on the wrong population.
Check the level of the whole measurement: a Level 2 curve with a Level 3 credit input can make the swap a Level 3 position.
Trace the number to the statements: the sum of the carrying values by category should agree with the balance sheet and the fair value notes. See Financial Statements.