Data Quality, Lineage and Valuation Control#

Valuation control is only as good as the data it runs on. A wrong position, a stale curve or a mapping error produces a wrong valuation, and if the same data feeds the control, the control can confirm the wrong answer. This page treats data quality as a valuation-control risk in its own right, and applies the principles of BCBS 239 to it.

BCBS 239 is the Basel Committee’s guidance on risk data aggregation and risk reporting, published in 2013 and aimed mainly at the largest banks. It is guidance on data and reporting, not part of the Basel capital rules, and it is covered in Governance: Model Risk, Accountability and Data. It is a separate strand from Basel CAP50 on prudent valuation, which is covered in Prudent Valuation: Legal Basis (Summary). This page is about how it applies to the daily work.

Data as a valuation-control risk#

The failure chain is short:

Bad data
  -> bad model input
    -> bad valuation
      -> bad IPV or control result
        -> bad P&L, disclosure and reporting

The dangerous cases are those where the control shares the fault with the thing it controls. If the desk and the IPV team take a curve from the same vendor feed, the comparison shows no difference even when the feed is wrong. If the position list used by IPV is built from the same extract as the desk’s, a missing trade is missing from both.

Data should be trusted before automation or AI is added to the process. A faster process on bad data gives wrong answers faster. See Systems and Automation in Valuation Control and AI in Valuation Control.

Accuracy and integrity#

Accuracy means that the data correctly represent what they describe. Integrity means that they are not altered or lost between the source and the use. For valuation control the data to consider are:

  • Positions: trade terms, notional, dates and counterparty are as agreed, and match the confirmation.

  • Market observations: the price or rate is from the intended source, at the intended time, in the intended units and quote convention.

  • Sensitivities and parameters: the risk numbers and model parameters are those produced by the approved model version.

  • Control calculations: the tolerance, the comparison and the adjustment are calculated correctly.

Typical failures are unit errors (basis points against percentage), convention errors (price against yield, lognormal against normal volatility), wrong tenor mapping, and overwritten values. Checks that catch them include range and reasonableness limits, comparison to the previous day, and cross-checks between related instruments.

Completeness#

Completeness means that everything that should be in the population is in it. It has four parts:

  • Trades: the full trading population is in the valuation and in the control. A common check is to compare counts and notionals between the booking system, the valuation system and the IPV population.

  • Inputs: every input that a valuation needs is present. A missing point is replaced by a default or an interpolation, and the replacement should be visible.

  • Portfolios and books: new books and legal entities are added to the scope when they are created.

  • Adjustments: every reserve and adjustment is captured in the bridge to fair value.

A simple example: the front-office system holds 12,480 live trades, the valuation system holds 12,480, and the IPV population holds 12,455. The 25 missing trades are all from a new book that was not mapped to the IPV scope. The check found it, and the cause is a scoping gap, not a pricing issue. A completeness exception should always be traced to a root cause.

Timeliness#

The data must be available early enough for the control to inform the decision. For IPV that means:

  • market data are captured at an agreed time and the control uses the same snapshot, or the difference is understood

  • the independent source is available before the P&L and the reports are finalised

  • month-end data are available early enough for adjustments to be booked in the period

A control that runs after the accounts are closed is a detective control for the next period and not a control over the current one. Where data arrive late, the process needs a defined fallback and a record of what was done.

Adaptability#

The data and the processes must cope with new products, new exposures and new information requests. In a valuation setting this is tested by events such as:

  • a new product with a new input type, for example a new index or a new volatility convention

  • a market event that needs a fast view of the exposure to one counterparty, sector or input

  • a regulatory request for a breakdown by a different dimension, such as by level, by AVA category or by model

If every new request needs a manual extract and a spreadsheet, the architecture does not adapt, and the manual steps are a source of error and a control risk.

Data lineage#

Lineage records where each number comes from and what was done to it. For valuation control it is the path from the source system through the valuation engine and the control process to the report.

Lineage for one volatility input#

Stage

Question

Evidence that should exist

Source

Where did the quote come from?

Named source and contributor, with the time stamp.

Capture and storage

Was it stored without alteration?

Feed log and a record of overrides.

Transformation

How was it converted to the model input?

Mapping, interpolation and unit conversion, under version control.

Valuation

Which model used it?

Model and version, and the run that used it.

Control

Which independent source was it compared with?

IPV result, with the tolerance and the decision.

Report

Where does it appear?

Reconciliation to the P&L, the reserve and the disclosure.

Good lineage lets a controller start from a reported figure and work back to the market observation, and the reverse. It also supports the impact analysis when a source is changed or an error is found: which valuations used the bad data?

Reconciliations and data controls#

Reconciliations are the main detective control over data. The set that matters for valuation includes:

  • Front office to the books: trade population and notional, to the ledger.

  • Valuation to the ledger: the carrying value in the valuation system agrees to the general ledger, with the reconciling items explained.

  • Sensitivities to valuation: risk figures are produced from the same positions and data as the valuation.

  • Market data to source: captured data agree with the vendor or exchange record.

  • IPV population to valuation population: every position in scope was tested, or has a documented exclusion.

Other data controls support these:

  • Preventive: mandatory fields, validation rules, restricted access, and approval of changes to sources and mappings.

  • Detective: staleness flags, outlier tests, day-on-day movement limits and break reports.

  • Ownership: a named data owner for each key source, and a process for resolving breaks within a set time.

Breaks should be aged and escalated. A list of old, unresolved breaks is evidence of a weak control.

BCBS 239 and valuation control#

BCBS 239 sets out principles in four groups: overarching governance and infrastructure, risk data aggregation capabilities, risk reporting practices, and supervisory review. The first three are the ones a valuation team can use. The table applies them to valuation control. It is an interpretation, in the spirit of the principles, and it does not quote them.

BCBS 239 themes applied to valuation control#

Theme

What it means in valuation control

Governance

A named owner for valuation data and for the data used in controls, with board and senior-management attention to the quality of the valuation and control reports.

Data architecture and IT infrastructure

Valuation, risk and finance draw from controlled, shared sources, so a number is the same wherever it appears, including in a stress.

Accuracy and integrity

Position and market data are reconciled to their sources. Manual steps are minimised and controlled.

Completeness

All positions, inputs and adjustments in scope are captured, and gaps are identified.

Timeliness

Control results are available when needed, in normal conditions and in stress.

Adaptability

New products, new views and ad hoc requests can be handled without ad hoc rebuilds.

Reporting

Reports on IPV, reserves, Level 3 and exceptions are accurate, clear, useful and sent to the right forums.

The principles are written for risk data in general, and they apply to valuation to the extent that valuation drives risk and finance reporting. They should not be read as a separate valuation rulebook. Their value is that they give an agreed language for what the data owners should deliver, and a reason to invest in a single, controlled source.

Note

The Basel Committee has published reviews and follow-up work on how banks are implementing the principles, and further updates may have been issued since this was written, including in 2026. Check the current Basel Committee publications for the latest text and expectations before relying on any summary.

Keep BCBS 239 apart from the other frameworks. SOX tests whether the information that feeds a financial-reporting control is complete and accurate, and BCBS 239 sets expectations for risk data and reporting. The same data failure can breach both, but the question and the audience differ. See Financial Reporting Controls and SOX and Appendix: Cross-Reference of Frameworks.

A valuation control view#

  • Treat data as a first-class risk. Include data quality in the risk-control matrix, with owners and evidence. See Risk-Control Matrix Template.

  • Make the control independent of the thing it controls. Check that the independent source, and the population, do not share the fault with the desk’s.

  • Trace the exceptions to causes. Count the breaks, and group them by cause: source, mapping, timing, population, manual step.

  • Know the lineage of the key inputs. For the inputs that carry most of the value, hold the path from source to report, and review it when something changes.

  • Fix the data before automating. Data issues that are tolerable in a manual process become failures at scale in an automated one.

  • Use the frameworks as support. BCBS 239 helps to argue for investment and ownership, and it does not replace the day-to-day checks.