Control Design and Effectiveness#

A control is only useful if it addresses a defined risk, produces evidence that it ran, and leads to action when it finds something. This page sets out a simple way to design valuation controls from the risk down, the types of control, how to test whether they work, what evidence to keep, and where valuation controls sit within the wider internal control over financial reporting (ICFR).

See also

Questions this page answers:

  • How do I get from a risk to a well-defined control?

  • What is the difference between preventive and detective, manual and automated controls?

  • How do I show that a control is designed well and operates as intended?

  • What evidence should I keep, and for how long?

From risk to escalation#

A control should be traceable through six steps:

The control chain#

Step

Question

Example

Risk

What could go wrong with the valuation?

The desk’s long-dated volatility mark is higher than market evidence supports.

Control objective

What must be true for the risk to be managed?

Volatility marks are within tolerance of independent evidence, or the difference is explained and adjusted.

Control

What is done, by whom, how often?

Monthly, valuation control compares each volatility mark with the consensus median and investigates breaches.

Evidence

What shows that it was done?

The comparison file, the breach list, the investigation notes and the sign-off.

Exception

What counts as the control failing or finding something?

A difference above the tolerance, a missing source, or a comparison not completed on time.

Escalation and remediation

Who is told, by when, and what is done?

Breaches over a stated size go to the head of valuation control within two working days, and an adjustment is booked if not resolved by month end.

Writing the chain out in this order avoids the common weakness of a control that exists and does not relate to a risk, or a risk with a control that cannot be shown to have run. The Risk-Control Matrix Template appendix gives a template.

The objective should be specific enough to be tested. “Marks are appropriate” is not testable. “Every mark in the population is compared with independent evidence at least monthly and differences above tolerance are investigated” is.

Control types#

Controls are described along two axes.

  • Preventive or detective. A preventive control stops an error from happening, for example a system that blocks a mark from a source that has not been approved. A detective control finds an error after it has happened, for example the monthly IPV comparison.

  • Manual or automated. A manual control depends on a person doing a step. An automated control is carried out by a system, with no judgement in the step itself.

Combinations of control type#

Type

Strength

Weakness

Automated and preventive

Consistent, cheap to run, strong evidence.

Needs the rules to be right, and change control over the system.

Automated and detective

Covers the full population every day.

Produces many exceptions if tolerances are poorly set.

Manual and preventive

Can apply judgement, such as approval of a new source.

Varies with the person and the workload.

Manual and detective

Can be applied to judgemental areas, such as a review of the Level 3 inputs.

Slow, sampled, and hard to evidence well.

Most valuation controls are detective, because the independence of the check means it takes place after the mark is set. Many are partly automated, with a system calculating the differences and a person reviewing the breaches. The judgemental part is still manual, and its evidence needs particular care. Automation is covered in Systems and Automation in Valuation Control.

Testing control effectiveness#

Two things can be tested, and both matter.

  • Design effectiveness. If the control operated exactly as described, would it meet its objective? A control that compares only the 10-year point of a curve does not meet an objective about the whole curve, however well it is run.

  • Operating effectiveness. Did the control operate as designed, consistently, over the period? This is tested on the actual instances of the control.

Typical tests:

  • Inquiry. Ask the control owner how it is done. This is the weakest test, and is not sufficient alone.

  • Inspection. Review the evidence that the control ran.

  • Reperformance. Carry out the control again on a sample and compare the result.

  • Observation. Watch it being performed.

  • Completeness of the population. Show that every item that should have been in the control was in it, for example that the list of positions checked equals the list of positions held.

The last point is often missed. A control that works perfectly on the items it sees gives no assurance about the items it does not see. For an IPV control, the key question is whether the population of marks was complete and whether any were excluded without a documented reason.

A small example of reperformance. A control compares 400 volatility marks each month. A tester takes a sample, recomputes the difference with the independent source, and checks the breach flag. Four items from the sample are shown.

tolerance_bp = 3.0
sample = [  # (desk_bp, independent_bp, flagged_by_control)
    (92.0, 88.0, True),
    (51.5, 50.0, False),
    (75.0, 71.5, True),
    (60.0, 59.0, False),
]
for desk, indep, flagged in sample:
    expected = abs(desk - indep) > tolerance_bp
    print(desk, indep, expected, flagged, "OK" if expected == flagged else "EXCEPTION")

The output is OK on all four lines. A line that returned EXCEPTION would show that the control missed a breach or raised a false one, and the reason must be found. For a real test, the sample size and the number of acceptable deviations are set by the testing methodology of the firm and the auditor, and are not set here.

Control evidence and documentation#

A control that cannot be evidenced is treated as not having operated. For each control, define what evidence is produced, and keep it so that an independent person can re-perform it.

A good evidence set has:

  • the population that was checked, and the date and time of the data

  • the source of the independent data, with its version

  • the calculation, or the system output, showing the differences

  • the exceptions and how each was resolved, with the person and the date

  • the review and sign-off, with a record of the review and what was challenged

  • the retention, in line with the firm’s records policy and any legal requirements

Some of the points on evidence are particular to valuation:

  • Record the judgement as well as the result. If a breach was explained and no adjustment made, say why, and by whom it was agreed.

  • Snapshot the data. Market data is overwritten, so the evidence must be stored on the day.

  • Keep the version of the methodology and the tolerances that applied at the time.

  • A sign-off should show review, not only completion. “Reviewed, no comments” is thin evidence for a large book.

Valuation controls within the ICFR environment#

Financial reporting controls, under SOX Section 404 and similar regimes, ask whether the firm’s controls over financial reporting are designed and operating effectively. Valuation controls are some of the most important controls within that environment, because fair values are judgemental numbers in the accounts. The three questions are different, and it helps to keep them apart. Take the same IPV control over a desk volatility input:

Three questions about one control#

Question

What it asks

Pillar

Valuation

Is the volatility input appropriate?

Valuation (and accounting fair value)

Valuation control

Was it independently verified against appropriate evidence?

Valuation control (IPV)

Financial-reporting control

Is that control designed properly and operating effectively within the financial-reporting process?

Financial control (SOX / ICFR)

SOX does not replace IPV, and IPV does not make a firm compliant with SOX. IPV may form part of the control environment on which reliable reporting depends. SOX mostly concerns the framework around the valuation, and not what the fair value should be. The detail is in Financial Reporting Controls and SOX.

A valuation control view#

  • Start from the risk. Each valuation control should map to a named risk, in the matrix.

  • State the objective in a testable way. It should be clear what a pass and a fail look like.

  • Check the population. Ask whether the control sees everything it should.

  • Look at the exceptions. Look at how many were raised, how many were closed, how long they were open, and whether the tolerance is set so that the control tells you something.

  • Test the evidence. Choose a sample and see whether a person who was not involved could reperform the control.

  • Watch for key-person controls. A control that depends on one person’s knowledge is fragile.

  • Review after change. A new product, source, model or system can quietly break an existing control.