Prudent Valuation RTS and AVAs#

The Prudent Valuation technical standards turn the principle in the CRR into a calculation. For each source of valuation uncertainty, the bank estimates an additional valuation adjustment (AVA), adds them up with a limited diversification benefit, and deducts the total from CET1. This page explains how the rules are structured, how the main AVAs work, and what has to be in place to support them. The principle and the legal basis are in Prudent Valuation: Legal Basis (Basel CAP50 and CRR), and worked cases are in Prudent Valuation Worked Examples.

CRR versus RTS#

The rules sit in layers, and the layer determines what takes priority.

The hierarchy of the rules#

Layer

Role

CRR (Articles 34 and 105)

The law. It sets the deduction from CET1, the principle of prudent valuation and the requirement for systems and controls. It also mandates the technical standards.

Regulatory technical standards (RTS)

Detailed rules, drafted by the EBA and adopted as a Commission Delegated Regulation. They specify the approaches, the AVA categories, the confidence levels and the aggregation. They must stay within what the CRR allows.

Supervisory guidance and Q&A

Clarifications of how the rules are applied, and supervisory expectations. They do not override the CRR or the RTS.

Firm policy

The firm’s own methodology, which has to comply with all of the above.

If the layers conflict, the higher one wins. When a question concerns the calculation, go to the RTS. When it concerns scope or the principle, go to the CRR. The UK has its own version of the RTS in retained or PRA rules, and the two are close in substance.

Note

The rules have been amended and are subject to further change, including through the later changes to the CRR. Check the current text for the thresholds, the list of categories and the aggregation rules before relying on any number given here.

Simplified and core approaches#

The RTS has two approaches, and the choice depends on the size of the fair-valued balance sheet.

  • Simplified approach. For a bank whose fair-valued assets and liabilities total up to EUR 15 billion in absolute terms, the AVA is a fixed 0.1% of the sum of the absolute values of those assets and liabilities. The RTS has further conditions around the use of the simplified approach, which should be checked.

  • Core approach. For every other bank, each AVA category is calculated using the formulas in the RTS.

For example, a bank has fair-valued assets of EUR 6 billion and fair-valued liabilities of EUR 5 billion. The sum is EUR 11 billion, which is below the threshold, so the AVA is 0.1% of 11 billion, which is EUR 11 million.

The simplified approach is cheap but it does not reflect the bank’s own risk. A bank near the threshold needs to plan for the move to the core approach, because the data and evidence needed are larger and take time to build.

AVAs as the core mechanism#

An AVA is the amount by which the fair value should be reduced to reach a prudent value. In the core approach, the main categories are calibrated so that there is 90% confidence that the bank could exit the position at the prudent value or better. The RTS sets the method by category, and in general:

  • AVAs are calculated at the level of the valuation exposure, for example a swaption volatility point or a credit spread, and then added up. This is why IPV data, which is organised by input, is the natural source.

  • The AVA is measured against the fair value that is already in the accounts, so only the uncertainty not already covered counts. Accounting reserves reduce the AVA.

  • Where there is not enough market data, expert-based approaches are allowed, but they have to be documented and supported.

Market price uncertainty AVA#

The market price uncertainty (MPU) AVA reflects the range of plausible market prices or inputs for a valuation exposure. Where there are consensus data, the dispersion of the contributions is the main evidence. Where there are none, the bank has to use another source of evidence, or expert judgement.

An illustration. A bank is long volatility, with a vega of 50,000 per volatility point in one bucket. The consensus mean is 62.0 and the standard deviation of contributions is 0.5. On a simple normal assumption, the level at which 90% of the distribution lies above is 62.0 minus 1.2816 times 0.5, which is about 61.36. The shortfall is about 0.64 points, so the MPU AVA for this exposure is about 50,000 times 0.64, which is about 32,000.

The actual RTS method uses its own rules for the data, and the normal assumption is only for illustration. The point is that the AVA is driven by the dispersion of independent evidence, and so it is a direct output of the IPV and consensus work.

Close-out costs AVA#

The close-out cost AVA reflects the cost of exiting the position, which is mainly the bid-offer spread, and the uncertainty about how wide it is. It is calculated against a mid-market valuation, and is reduced by any close-out or bid-offer adjustment that is already in the fair value.

A simple case, with the same position. At 90% confidence the bid-offer is 0.80 volatility points, so the cost of exit from the mid is half of that, 0.40 points. The close-out cost at 90% confidence is 50,000 times 0.40, which is 20,000. The fair value already holds a bid-offer reserve of 12,000 on this exposure. The AVA is the difference, which is 8,000.

Model risk AVA#

The model risk AVA reflects the valuation uncertainty from the choice of model and calibration. Where valuations from different reasonable models, or from different calibrations, give different results, the AVA reflects the range at 90% confidence, net of any model reserve in the fair value.

The evidence is the output of model validation and model risk work: alternative models, benchmark values and the sensitivity to choices. Where this is sparse, expert judgement is allowed, with a documented rationale. This category is often the hardest to document, and should be built from the same range of values as the model reserves. See Model Risk in Valuation.

Other AVA categories#

The RTS has more categories, and they are smaller in most banks.

Other AVA categories#

Category

Uncertainty addressed

Link

Unearned credit spreads

The uncertainty in the credit adjustment on derivatives, from uncertain spreads.

CVA. See Valuation Adjustments and Reserves.

Investing and funding costs

The uncertainty in the funding cost of a position.

FVA. See Valuation Adjustments and Reserves.

Concentrated positions

The extra exit cost of a position that is large compared with the market.

Concentration reserve. See Valuation Adjustments and Reserves.

Future administrative costs

The costs of running off positions that cannot be closed out.

Expense assumptions.

Early termination

Losses on early termination of client trades, if not covered by the contract.

Contract terms.

Operational risk

Valuation losses from operational failures on model-valued positions.

Calculated by a formula in the RTS.

Aggregation#

The AVAs are added to give a total, with a limited benefit for diversification. The benefit applies at category level to only three categories: market price uncertainty, close-out costs and model risk. For these the RTS Annex sets out methods for the aggregation, of which the simpler takes 50% of the sum of the individual AVAs. The illustration below uses that treatment.

The other categories get no such benefit. Concentrated positions and future administrative costs are a plain sum of the individual AVAs. Unearned credit spreads, investing and funding costs, early termination and operational risk have no diversification at all. The category totals are then summed, with no benefit across categories.

Two further rules shape the result. Each AVA is net of any fair-value adjustment that addresses the same source of uncertainty, so reserves in the accounts reduce it. And an AVA is never negative, so a reserve larger than the prudent amount does not create a credit against other AVAs.

An aggregation example (illustrative, in EUR m)#

Category

Individual AVAs

Sum of individual AVAs

Category AVA

Market price uncertainty (50% of the sum)

4.0, 2.0, 6.0

12.0

6.0

Close-out costs (50% of the sum)

3.0, 1.0, 2.0

6.0

3.0

Model risk (50% of the sum)

3.0, 1.0, 4.0

8.0

4.0

Unearned credit spreads

1.5

1.5

Investing and funding costs

0.8

0.8

Concentrated positions (plain sum)

1.2, 0.8

2.0

2.0

Future administrative costs (plain sum)

0.5

0.5

Early termination

0.3

0.3

Operational risk

0.9

0.9

Total deducted from CET1

32.0

19.0

The figures are invented, and each individual AVA is taken as already net of the accounting reserves. The operational risk figure is assumed to have been calculated using the RTS formula. The undiversified sum is 32.0 and the diversification benefit is 13.0 (6.0 on market price uncertainty, 3.0 on close-out costs and 4.0 on model risk), which leaves 19.0. This is a deduction from CET1 and does not change the accounts.

Systems, controls and documentation#

The CRR and RTS expect systems and controls as well as numbers. A bank using the core approach needs, at least:

  • a prudent valuation policy that sets out the methodology, the approach by category and the responsibilities

  • governance, with senior management approval and independent review, and with internal audit coverage

  • data with a clear lineage, from the valuation system and the IPV process to the AVA calculation, so that the inputs can be traced and reconciled. See Data Quality, Lineage and Valuation Control.

  • evidence for expert-based approaches, and for the selection of data, with the reasons recorded

  • reconciliation with the accounting fair value and the reserves, so that the netting is correct and reproducible

  • supervisory reporting through the regulatory reporting templates for prudent valuation, which give the supervisor the AVAs by category and the underlying fair-valued balances

  • a regular review of the method, the thresholds and the approach selected, especially for a bank that is near the simplified-approach limit

A valuation control view#

  • The AVA is built from valuation control outputs: consensus dispersion, bid-offer evidence, model ranges and reserve schedules. If the IPV data is incomplete, the AVA is weak.

  • Net against the accounting reserves, and test for it. A change in a reserve changes the AVA, and the two should move together and be explained.

  • Build one range of values per input, and use it for the Level 3 sensitivity, the reserve, and the AVA. Three different ranges for the same input will be questioned.

  • Keep documentation for the expert judgements. They are the part of the calculation that a supervisor is most likely to challenge.

  • Use the AVA as a management signal. A growing total or a concentration in one product shows where valuation uncertainty is building.